Котел Immergas Mini Eolo 24 3 E - инструкция пользователя по применению, эксплуатации и установке на русском языке. Мы надеемся, она поможет вам решить возникшие у вас вопросы при эксплуатации техники.
Если остались вопросы, задайте их в комментариях после инструкции.
"Загружаем инструкцию", означает, что нужно подождать пока файл загрузится и можно будет его читать онлайн. Некоторые инструкции очень большие и время их появления зависит от вашей скорости интернета.

40
STMiE3E ed 09/11
MINI EOLO 3 E
Technical Documentation
Technical Documentation
P4
Minimum CH output
The boiler also has electronic modulation that adapts the
boiler potentiality to the effective heating demand of the
house. Then the boiler works normally in a variable gas
pressure field between the minimum heating output and
the maximum heating output depending on the system's
heating load.
N.B.:
the boiler is produced and calibrated in the central
heating phase at nominal output. Approximately 10
minutes are needed to reach the nominal heat output
changeable using parameter (S1).
N.B.:
the selection of the “Minimum heating output” and
“Maximum heating output” parameters, in the presence of
a heating request, allows switch-on of the boiler and power
supply of the modulator with current equal to the value of
the respective set value.
0 - 60 %
Functional,
as per the
final test
P5
Maximum CH output
0 - 99 %
99
P6
Central heating ignitions
timer
The boiler has electronic timing, which prevents the burner
from igniting too often in central heating mode.
0 - 20
(01 = 30 sec.)
6
(3 min.)
P7
Central heating ramp
timer
In the ignition phase, the boiler performs an ignition ramp
in order to arrive at the maximum power set.
0 - 28
(01 = 30 sec.)
28
(14 min.)
P8
CH ignition delay from
TA and CR request
The boiler is set to switch-on immediately after a request.
In the case of particular systems (e.g. area systems with
motorised thermostatic valves etc.) it may be necessary to
delay ignition.
0 - 20
(01 = 30 sec.)
0
P9
Solar delay timing
The boiler is set to switch-on immediately after a request.
for DHW In the case of coupling with a solar storage
tank positioned upstream from the boiler, it is possible to
compensate the distance between the storage tank and the
boiler in order to allow the water to reach the boiler. Set
the time necessary to verify that the water is hot enough
(see par. Solar panels coupling).
0 - 30
seconds
0
GAS submenu
After entering the programming mode, press button 2 (
)
for 4 seconds to access this menu.
The parameters can be changed by following the procedure
described above.
To exit the menu, press button 2 (
) 4 seconds.
Id
Parameter
Parameter
Description
Range
Default
G1
Gas type selection
Determines the type of gas being used:
nG - Methane
lG - LPG
Ci – Industrial gas
lG - nG - Ci
The same
as the type
of gas
being used
G2
Ignition power
This establishes the boiler's ignition output.
0 - 50 %
Functional,
as per the
final test
Характеристики
Остались вопросы?Не нашли свой ответ в руководстве или возникли другие проблемы? Задайте свой вопрос в форме ниже с подробным описанием вашей ситуации, чтобы другие люди и специалисты смогли дать на него ответ. Если вы знаете как решить проблему другого человека, пожалуйста, подскажите ему :)