Шлифмашины Bosch GWS 26 230 LVI - инструкция пользователя по применению, эксплуатации и установке на русском языке. Мы надеемся, она поможет вам решить возникшие у вас вопросы при эксплуатации техники.
Если остались вопросы, задайте их в комментариях после инструкции.
"Загружаем инструкцию", означает, что нужно подождать пока файл загрузится и можно будет его читать онлайн. Некоторые инструкции очень большие и время их появления зависит от вашей скорости интернета.

16
| English
1 619 929 J75 | (26.10.11)
Bosch Power Tools
Noise/Vibration Information
The measured values of the machine are listed in the table on
page 225.
Noise and vibrational values (vector sum of three directions)
determined according to EN 60745.
The vibration emission level given in this information sheet
has been measured in accordance with a standardised test
given in EN 60745 and may be used to compare one tool with
another. It may be used for a preliminary assessment of expo-
sure.
The declared vibration emission level represents the main ap-
plications of the tool. However if the tool is used for different
applications, with different accessories or poorly maintained,
the vibration emission may differ. This may significantly in-
crease the exposure level over the total working period.
An estimation of the level of exposure to vibration should also
take into account the times when the tool is switched off or
when it is running but not actually doing the job. This may signif-
icantly reduce the exposure level over the total working period.
Identify additional safety measures to protect the operator
from the effects of vibration such as: maintain the tool and the
accessories, keep hands warm, organise work patterns.
Mounting and Operation
The following table indicates the action objectives for mounting and operation of the power tool. The instructions for each action
objective are shown aside. Depending on the type of application, various instruction combinations are required. Observe the
safety instructions.
Action
Figure
Please observe
Page
Grinding, preparation
1
226 – 227
Cutting, preparation
2
228 – 229
Cutting stone, brick and tiles,
preparation (recommenda-
tion)
3
230 – 231
Removing paint, preparation
4
232
Removing rust, preparation
5
233
Mounting the quick-clamping
nut
6
234
Dismounting the quick-clamp-
ing nut
7
234
30°
OBJ_BUCH-1528-001.book Page 16 Wednesday, October 26, 2011 8:25 AM